Pune-Mumbai Expressway Missing Link Cable-Stayed Bridge
The owner, status and timeline of this project. A free account opens every field.
Source: The Bridge Chronicle
The project involves the construction of a cable-stayed bridge as part of the 'Missing Link' on the Pune-Mumbai Expressway. The bridge is 650 meters long with towers 182 meters high, designed to improve connectivity and reduce travel time between Pune and Mumbai. The project includes asphalt laying and vehicle testing, with the bridge set to open for traffic soon.
- Status
- Closed
- Sector
- Bridge, Road
- Location
- Pune/Mumbai, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- The Bridge Chronicle
ConstructChat
Ask ConstructChat about Pune-Mumbai Expressway Missing Link Cable-Stayed Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of a cable-stayed bridge as part of the 'Missing Link' on the Pune-Mumbai Expressway. The bridge is 650 meters long with towers 182 meters high, designed to improve connectivity and reduce travel time between Pune and Mumbai. The project includes asphalt laying and vehicle testing, with the bridge set to open for traffic soon. |
Original sector | Transportation |
Budget |
Location
Country | India |
State | Maharashtra |
City | Pune/Mumbai |
Source
Source | The Bridge Chronicle |
URL |
More Details
Record type | Project |
Sector | Bridge, Road |
Article published date | 2026-03-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
