logo
ProjectUnder Construction

Pune-Mumbai Expressway Missing Link Project

The owner, status and timeline of this project. A free account opens every field.

Source: News18

A new 13.3 km stretch being built between Khopoli and near Lonavala on the Pune-Mumbai Expressway to bypass the Lonavala-Khandala ghat, shortening the current 19 km route by about six kilometers. The project includes a long tunnel system with the longest tunnel running about 8.9 km beneath Lonavala Lake, multiple viaducts, and a 650-metre cable-stayed bridge over Tiger Valley. Most civil construct

Status
Under Construction
Sector
Bridge, Tunnel, Road, Government
Location
Pune, Maharashtra, India
Updated
22 Jul 2026
Source
News18

ConstructChat

Ask ConstructChat about Pune-Mumbai Expressway Missing Link Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pune-Mumbai Expressway Missing Link Project” is an infrastructure initiative in the Bridge sector, located in Pune, Maharashtra, India. Taiyo aggregates data on it from News18.

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A new 13.3 km stretch being built between Khopoli and near Lonavala on the Pune-Mumbai Expressway to bypass the Lonavala-Khandala ghat, shortening the current 19 km route by about six kilometers. The project includes a long tunnel system with the longest tunnel running about 8.9 km beneath Lonavala Lake, multiple viaducts, and a 650-metre cable-stayed bridge over Tiger Valley. Most civil construction is largely complete, with ongoing work on the bridge deck, cable tensioning, road surfacing, and safety systems installation.

Original sector

Transportation

Location

Country

India

State

Maharashtra

City

Pune

Source

Source

News18

URL

More Details

Record type

Project

Sector

Bridge, Tunnel, Road, Government

Article published date

2025-12-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project