Purchase and Install 2 of the 3 raw water low lift pumps at 50 Agnes Street, Charlton
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
Objective: Purchase and install 2 of the 3 raw water low lift pumps which are critical to the operations as they feed all water to be treated to the treatment plant. The existing pumps are the age of the water plant and are due for replacement and show signs of wear through decreased performance. New pumps will allow us to better manage demand, reduce maintenance and extend the life of the pumps.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Objective: Purchase and install 2 of the 3 raw water low lift pumps which are critical to the operations as they feed all water to be treated to the treatment plant. The existing pumps are the age of the water plant and are due for replacement and show signs of wear through decreased performance. New pumps will allow us to better manage demand, reduce maintenance and extend the life of the pumps. Scope: To purchase new adequately sized raw water pumps similar in nature to the existing pumps. Remove the two pumps most in need of attention and replace with the newly purchased pumps. Wire the new pumps into the PLC (programmable logic control), test pumps, commission and provide training to staff of the operation of the new pumps. Output: Enhance the efficiency of the high lift pumping system at the water plant. These components coupled with the new high left pumps will enable the hydropneumatic tank to the removed. Benefits: Improved reliability of the water plant raw water feed system which is paramount to the operation. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
