ProjectCompleted

Purchase and Install Turbo Blower (with Programmable Logic Controller (PLC) and Supervisory Control and Data Acquisition (SCADA) System)

Completed · Ontario

Source: Infrastructure Canada

The project will purchase and install Programmable Logic Controller (PLC)/Supervisory Control and Data Acquisition (SCADA) controls to link the DO (dissolved oxygen) sensors and the turbo blower so the equipment will only be operating when needed. Having a second turbo blower will extend the life of the existing blower and provide a backup to a critical piece of equipment should there be a malfunc

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Purchase and Install Turbo Blower (with Programmable Logic Controller (PLC) and Supervisory Control and Data Acquisition (SCADA) System)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Purchase and Install Turbo Blower (with Programmable Logic Controller (PLC) and Supervisory Control and Data Acquisition (SCADA) System)” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will purchase and install Programmable Logic Controller (PLC)/Supervisory Control and Data Acquisition (SCADA) controls to link the DO (dissolved oxygen) sensors and the turbo blower so the equipment will only be operating when needed. Having a second turbo blower will extend the life of the existing blower and provide a backup to a critical piece of equipment should there be a malfunction or a need for major maintenance. Up to 90% of the electricity requirements of the treatment process is to have blowers infuse oxygen into the system. A turbo blower provides greater efficiency than a conventional blower. A turbo blower is expected to reduce energy consumption by operating at variable speeds. There are dissolved oxygen (DO) sensors mounted in the aeration tanks but there is no automation to signal the blower that more or less oxygen is required therefore, the blower runs continuously (24/7; 365 days per year).

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Government

Article published date

2026-02-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project