Purchase, experimentation and deployment planning for 30-foot electric buses
Sector: Hydro • Location: Quebec, Canada
Source: Infrastructure Canada
As part of a pilot project, this project involves acquiring a 30-foot electric bus in order to test it over a complete maintenance and operation cycle and to assess deployment scenarios over the entire system. With the cost savings achieved through this pilot project, the RTL wishes to add 18 additional studies to evaluate the deployment scenarios for electric buses across its network. These addit
- Status
- Closed
- Sector
- Hydro, Automotive, Commercial, Government
- Location
- Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Purchase, experimentation and deployment planning for 30-foot electric buses
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | As part of a pilot project, this project involves acquiring a 30-foot electric bus in order to test it over a complete maintenance and operation cycle and to assess deployment scenarios over the entire system. With the cost savings achieved through this pilot project, the RTL wishes to add 18 additional studies to evaluate the deployment scenarios for electric buses across its network. These additional studies that need to be completed are part of the initial description of the project to test the acquisition of a bus over a full cycle of maintenance and operation. The studies are as follows: (1) study of the future commercial offer of all-electric buses and their charging system; (2) forecast demand for public transit in the territory served by the RTL; (3) forecasting the changing needs of RTL vehicles; (4) review of park management and deployment plans; (5) evaluation of the need to upgrade the computerized service planning system; (6) review of industry best practices for the operation, maintenance (routine and periodic) and charging of electric buses; (7) optimization of inspection processes (RDS), routine maintenance and refueling / refilling at RTL; (8) conceptual business planning study; (9); location study (optional); (10) transition plan for operations and facilities; (11) preliminary designs of facilities for budgetary purposes; (12) impact study of electrification on tasks; (13) study of skill gaps; (14) study of hiring and training needs; (15) entering into agreements with Hydro-Québec; (16) study of the impact of all required changes and investments (CAPEX) on the acquisition and operating costs of the RTL between 2019 and 2024; (17) financing plan; (18) implementation master plan. |
Original sector | Public Transit |
Budget |
Location
Country | Canada |
State | Quebec |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Hydro, Automotive, Commercial, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Manitoba Hydro High Voltage Test Facility
- Wuskwatim Generating Station
- Manitoba Hydro Dorsey Converter Station
- Beeton Hydroelectric Development
- Thorold Cogeneration Project Ontario Canada
- Claresholm Solar Project Alberta
- Halton Hills Combined Cycle Plant
- Highway Rehab -- Bridge replacement Power Dam Interchange 786, United Counties of Stormont, Dundas and Glengarry
