logo
ProjectClosed

Pushkara Lift Irrigation Scheme Implementation Project

The status, timeline and source of this project. A free account opens every field.

Source: India Investment Grid (IIG)

Information Water Resources Department, Govt. of A.P has come up with Pushkara Lift Irrigation Scheme Implementation Project with a ticket size of 674.52 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The Pushkara Lift irrigation scheme is a major

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Road, Government, Power Generation (CCGT)
Location
purushothapatnam, Andhra Pradesh, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Pushkara Lift Irrigation Scheme Implementation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pushkara Lift Irrigation Scheme Implementation Project” is an infrastructure initiative in the Water Supply and Storage sector, located in purushothapatnam, Andhra Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information Water Resources Department, Govt. of A.P has come up with Pushkara Lift Irrigation Scheme Implementation Project with a ticket size of 674.52 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The Pushkara Lift irrigation scheme is a major irrigation Lift irrigation project, constructed at left bank of River Godavari near Purushothapatnam village in Seethanagaram mandal in East Godavari district in Andhra Pradesh state. This project contemplates to irrigation benefits to an extent of 75,235 Ha 1,85,906 acres during Kharif season with utilization of 334 M.cum 11.80 TMC of water from river Godavari intake wells of 1st stage pump house will be lifted from +13m to +40m level and runs for a length of 95.50km to provide irrigation facilities to an extent of 1,02,998 acres 41,682Ha and 2nd stage lifts at three different locations to an extent of 82,908 acres in the upland areas of East Godavari district besides providing drinking water facilities to 5.23 lakh people living in 143 villages en route canal and command area. The contemplated ayacut under the Pushkara Lift Irrigation Scheme is 75235 ha.

Original sector

Water Resources

Procurement method

Budget

Location

Country

India

State

Andhra Pradesh

City

purushothapatnam

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Road, Government, Power Generation (CCGT)

Article published date

2024-02-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project