logo
ProjectClosed

PV Redevelopment Phase 3 Infrastructure

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Phoenix, Arizona; PV Redevelopment Phase 3 Infrastructure . The project is in Phoenix, Arizona at the northwest corner of Tatum Boulevard and Cactus Road. The project consists of roadway improvements within public access easements including paving, concrete curb and crosswalks, grading and drainage, public water and sewer, and associated improvements for Phase 3 Infrastructure located around Lot 1

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Commercial, Car parking, Road, Solar, Cement, Automotive
Location
Phoenix, Arizona, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about PV Redevelopment Phase 3 Infrastructure

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PV Redevelopment Phase 3 Infrastructure” is an infrastructure initiative in the Water Supply and Storage sector, located in Phoenix, Arizona, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Phoenix, Arizona; PV Redevelopment Phase 3 Infrastructure . The project is in Phoenix, Arizona at the northwest corner of Tatum Boulevard and Cactus Road. The project consists of roadway improvements within public access easements including paving, concrete curb and crosswalks, grading and drainage, public water and sewer, and associated improvements for Phase 3 Infrastructure located around Lot 13 and Lot 19 of the PV Redevelopment.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Phoenix

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Commercial, Car parking, Road, Solar, Cement, Automotive

Article published date

2024-10-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project