logo

pvDesign® accelerates and optimises the Design of Utility-Scale Photovoltaic plants

Sector: Power Generation (CCGT) • Location: Spain

Source: EU Funding & Tenders Portal

Project
Ended

The worldwide growth of utility-scale PV solar industry, expected to reach 1TW in 2022, has established the need for new tools to absorb the exponential amount of feasibility analysis and to get enhanced design and basic engineering process of PV solar plants. Developing a PV project is a process involving many stages and requires valuable resources of engineer-man-hours. The lack of suitable PV d

Project Information FAQ

Project Information

3 Q
The project “pvDesign® accelerates and optimises the Design of Utility-Scale Photovoltaic plants” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Spain. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The worldwide growth of utility-scale PV solar industry, expected to reach 1TW in 2022, has established the need for new tools to absorb the exponential amount of feasibility analysis and to get enhanced design and basic engineering process of PV solar plants. Developing a PV project is a process involving many stages and requires valuable resources of engineer-man-hours. The lack of suitable PV design tools at feasibility level is boosting the interest generated by RatedPower in the PV solar industry. Our solution, pvDesign is a SaaS cloud-based tool that allows to automate the utility-scale PV power plant feasibility analysis, design and basic engineering process making it much faster (max 1h), accurate and reliable (errors reduction from 10% to 3.5%), thus boosting the efficiency of our target customer. The ultimate objective of designing and studying with pvDesign is to accelerate the best combination selection by making easier the work, also reducing the probability of miscalculations that risk the profitability of these large investments. Furthermore, it can provide a wider range of plant configurations in order to find the optimum one, so to prevent great investment losses over the initial years of the plant´s operation due to poorly done studies. pvDesign is the only system in the market focusing primarily on the feasibility analysis, design and basic engineering study of a PV utility-scale power plants. There is no similar product on the market that offers automatically production and financial reports along with all the necessary engineering documentation. Since May 2017, 25 companies from 10 different countries have already purchased pvDesign. From 2019 on, we will emphasise sales with the intention to become a market standard and pursue a total market share <50%. The project is highly lucrative with total sales in 2023 of €11 million, Cumulative Net profit €10 million, and ROI=5,51. The total number of jobs created in the period will be 65.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data