logo

PY Energy Sector Strengthening Project

Sector: Power Transmission • Location: Paraguay

Source: World Bank Group

Project
Closed

The objective of the Energy Sector Strengthening Project for Paraguay is to increase the quantity and quality of the provision of electricity services by the Borrower, while improving the Borrower's performance. There are three components to the project, the first component being modernizing the borrower's distribution management system and installing an advanced metering system for large consumer

Project Information FAQ

Project Information

5 Q
The project “PY Energy Sector Strengthening Project” is an infrastructure initiative in the Power Transmission sector, located in Paraguay. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Energy Sector Strengthening Project for Paraguay is to increase the quantity and quality of the provision of electricity services by the Borrower, while improving the Borrower's performance. There are three components to the project, the first component being modernizing the borrower's distribution management system and installing an advanced metering system for large consumers. This component includes the installation of a 66kV and 23kV advanced metering system which allows remote consumption metering and disconnection or reconnection of the Borrower's large customers. The second component is the improving the performance of the transmission network. This component will provide resources to support: a) installation of reactive compensation at the Guarambare substation in the Paraguayan Central Department; and b) extension of about ten (10) existing substations including the expansion of the transformation capacity of said substations (excluding transmission line investments). Finally, the third component is the strengthening Paraguay's electricity sector and the Borrower's institutional capacity.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data