logo
ProjectClosed

PY Energy Sector Strengthening Project

Sector: Power Transmission • Location: Paraguay

Source: World Bank Group

The objective of the Energy Sector Strengthening Project for Paraguay is to increase the quantity and quality of the provision of electricity services by the Borrower, while improving the Borrower's performance. There are three components to the project, the first component being modernizing the borrower's distribution management system and installing an advanced metering system for large consumer

Status
Closed
Sector
Power Transmission, Broadband, Telecommunications, Power Generation (CCGT), Government
Location
Paraguay
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about PY Energy Sector Strengthening Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “PY Energy Sector Strengthening Project” is an infrastructure initiative in the Power Transmission sector, located in Paraguay. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Energy Sector Strengthening Project for Paraguay is to increase the quantity and quality of the provision of electricity services by the Borrower, while improving the Borrower's performance. There are three components to the project, the first component being modernizing the borrower's distribution management system and installing an advanced metering system for large consumers. This component includes the installation of a 66kV and 23kV advanced metering system which allows remote consumption metering and disconnection or reconnection of the Borrower's large customers. The second component is the improving the performance of the transmission network. This component will provide resources to support: a) installation of reactive compensation at the Guarambare substation in the Paraguayan Central Department; and b) extension of about ten (10) existing substations including the expansion of the transformation capacity of said substations (excluding transmission line investments). Finally, the third component is the strengthening Paraguay's electricity sector and the Borrower's institutional capacity.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Paraguay

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Transmission, Broadband, Telecommunications, Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project