Pymatuning Beach & Campground Wastewater System Improvements
Sector: Car parking • Location: Andover, Ohio, United States of America
Source: Dodge USA
The Ohio Department of Natural Resources (ODNR) operates a wastewater collection and treatment system at Pymatuning State Park located at 6100 Pymatuning Lake Road, Andover, Ohio 44003 in Ashtabula County. The wastewater system was originally constructed in 1971 and was expanded in 1985. The wastewater system, in its current condition requires significant upgrades and improvements. The collection
- Status
- Closed
- Sector
- Car parking, Road, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial
- Location
- Andover, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pymatuning Beach & Campground Wastewater System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Ohio Department of Natural Resources (ODNR) operates a wastewater collection and treatment system at Pymatuning State Park located at 6100 Pymatuning Lake Road, Andover, Ohio 44003 in Ashtabula County. The wastewater system was originally constructed in 1971 and was expanded in 1985. The wastewater system, in its current condition requires significant upgrades and improvements. The collection system consists of a network of 6-inch and 8-inch gravity sewers, 3 lift stations, and a force ma... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Andover |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
