Pyramids Station Project
One of 7 projects Taiyo tracks in Giza Governorate.
Source: ZAWYA
The Pyramids Station project is part of the first phase of Metro Line 4 in Cairo, Egypt. It involves construction works including tunnel boring, installation of concrete segments, railway tracks, signaling systems, and electrical connections. The project aims to connect 6th of October City and New Cairo to the Greater Cairo Metro network, serving densely populated areas and integrating with the 6t
- Status
- Under Construction
- Sector
- Mass Transit, Rail, Tunnel, Cement
- Location
- Giza, Giza Governorate, Egypt
- Updated
- 22 Jul 2026
- Source
- ZAWYA
ConstructChat
Ask ConstructChat about Pyramids Station Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Pyramids Station project is part of the first phase of Metro Line 4 in Cairo, Egypt. It involves construction works including tunnel boring, installation of concrete segments, railway tracks, signaling systems, and electrical connections. The project aims to connect 6th of October City and New Cairo to the Greater Cairo Metro network, serving densely populated areas and integrating with the 6th of October Monorail. The project is scheduled to open in the first half of 2028. |
Original sector | Transportation |
Location
Country | Egypt |
State | Giza Governorate |
City | Giza |
Source
Source | ZAWYA |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Tunnel, Cement |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
