logo

Qair solar plants

Sector: Power Generation (CCGT) • Location: Hadjer-Lamis, Chad

Source: World Bank Group

Project
Active

The project entails the development of two solar plants with a combined capacity of 30 MW in Chad. The plants will be deployed at two sites, of 40ha and 100ha, to the north and southeast, respectively, of N’Djamena, in the districts of Lamadji and Gassi. Sponsor is French renewable energy company Qair, which plans to invest $ 35 million in the project. Debt information is not available. Qair had s

Status
Prospective
Sector
Power Generation (CCGT), Power Transmission, Solar, Commercial, Government
Location
Hadjer-Lamis, Chad
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Qair solar plants

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Qair solar plants” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Hadjer-Lamis, Chad. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the development of two solar plants with a combined capacity of 30 MW in Chad. The plants will be deployed at two sites, of 40ha and 100ha, to the north and southeast, respectively, of N’Djamena, in the districts of Lamadji and Gassi. Sponsor is French renewable energy company Qair, which plans to invest $ 35 million in the project. Debt information is not available. Qair had secured the 20-year PPAs for the two projects from the country's utility, Société Nationale d’Électricité (SNE), in September. Construction on two solar plants started on April 8th, 2021 and the plants are planned to be grid-connected in 2022. https://www.pv-magazine.com/2021/04/08/qair-begins-construction-on-30-mw-of-solar-in-chad/

Original sector

Energy

Budget

Location

Country

Chad

State

Hadjer-Lamis

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Solar, Commercial, Government

Article published date

2024-05-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project