logo

Qatar Pearl GTL-LPU(c5)

Sector: LNG • Location: Qatar

Source: Hyundai Engineering

Project
Closed

A new plant construction history made by Hyundai E&CQatar the world’s third-largest natural gas reserves was proceeding various complex development projects with its enormous oil money. Hyundai E&C lifted up its head in competition with other leading global construction companies participated in the large-scale GTL(Gas-To-Liquid) construction project. It was ordered by the global energy powerhouse

Project Information FAQ

Project Information

5 Q
The project “Qatar Pearl GTL-LPU(c5)” is an infrastructure initiative in the LNG sector, located in Qatar. Taiyo aggregates data on it from Hyundai Engineering.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A new plant construction history made by Hyundai E&CQatar the world’s third-largest natural gas reserves was proceeding various complex development projects with its enormous oil money. Hyundai E&C lifted up its head in competition with other leading global construction companies participated in the large-scale GTL(Gas-To-Liquid) construction project. It was ordered by the global energy powerhouse Qatar for the first time as a Korean construction company in 2006.Spread the technical competence of Hyundai E&C to the world The GTL process means a high added value plant project generating liquid products including ultra-low sulfur diesel and naphtha, LNG, condensate (super light crude oil) from the natural gas obtained through offshore drilling.    Hyundai E&C won the large-scale GTL contract as the first Korean construction company in 2006. The GTL5 ordered by global energy company Royal Dutch Shell was a mega project whose construction cost was amounted to USD 1.3 billion.The GTL5 project was consisted of a total of 8 packages. The Liquid Processing Unit (LPU) taken by Hyundai E&C was a facility refining synthetic oil to a sellable product, the three main processes along with Feed Gas Preparation (FGP) and GTL.Brought the best effects with effective site managementHyundai E&C took the lead in effectively conducting construction and managing process by applying Hyundai Piping Material Control System (HPMAC) developed by ourselves. With the HPMAC, if the values in a drawing were entered, all details required in construction including the number of workforce, the amount of construction material, and supply time of material needed in a particular process come out, assisting us to proceed construction efficiently without errors. Moreover, it enabled people to figure out the construction progress just at a glance by informing all processes to the ordering organization and constructor in real time.From the commencement of construction, Hyundai E&C led the entire construction by recording the top in the process rate. We demonstrated the potential energy of Hyundai E&C and Koreans in the GTL site in terms of quality by being ranked top in “Site Technical Assurance Review (STAR).” Audit performed by the ordering organization among global leading construction companies engaged in the Pearl GTL construction site in the first half of 2009.Receiving the highest praise from the ordering organization and competitors throughout the entire process including construction·safety·quality management, the GTL site was completed in November 2011. Currently, the GTL site produces 140,000 barrels of clean fuel per day, accounting for about 3% of the entire global diesel market.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data