Qatar Petroleum District

Sector: Automotive • Location: Qatar

Source: Bouygues

Project
Closed

Project In the West Bay business district in Doha, the capital of Qatar, Bouygues Bâtiment International, a subsidiary of Bouygues Construction, has delivered one of the biggest property development projects in the world in partnership with the Qatari companies Midmac Contracting Company w.l.l. and Aljaber Engineering l.l.c. The Qatar Petroleum District, also known as the QP District, includes nin

Project Information FAQ

Project Information

4 Q
The project “Qatar Petroleum District” is an infrastructure initiative in the Automotive sector, located in Qatar. Taiyo aggregates data on it from Bouygues.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Project In the West Bay business district in Doha, the capital of Qatar, Bouygues Bâtiment International, a subsidiary of Bouygues Construction, has delivered one of the biggest property development projects in the world in partnership with the Qatari companies Midmac Contracting Company w.l.l. and Aljaber Engineering l.l.c. The Qatar Petroleum District, also known as the QP District, includes nine office blocks, the tallest of which has 52 levels, a five-star hotel complex with more than 400 rooms, a shopping centre, a conference centre, a mosque and all the car parks and external facilities required by these complexes. Human capital The construction site was launched in September 2009 and delivered at the end of 2016. During the peak period (around the end of 2011 and the start of 2012), 7,000 employees were involved. A few figures demonstrate the sheer scale of the project: 690,000 m2 of flooring, 450,000 m3 of concrete, 66,000 tonnes of steel frames, 330,000 m2 of curtain walls, 145 lifts, etc. Altogether, 696,000 m² of space was built. Challenge Aside from its sheer size, the principal challenge of this project lay in organisation. Logistics management was one of the biggest challenges as the quantity of materials used was breathtaking: up to 1,000 m3 of concrete and between six and ten semi-trailers of steel per day during the structural works phase. To increase storage space on-site, an intermediary storage site was set up outside the city, some 30 minutes from the site. A team of roughly ten people worked on scheduling for the construction site, optimising procurement and taking account of the risks in the country. Innovation To set up the security system most suitable for the nine towers and three underground levels that make up the QP District, Alcea Qatar performed a technical study to draw up an implementation plan. The system included features such as access control, physical obstacles, X-ray screening, worker protection and anti-intrusion video surveillance. In total, more than 3 000 cameras and 2,500 access control points were installed at the site. For the safety of site workers during the installation of posts and girders on the outside of the building, a coupled system of rail-guiding and crane-hoisting was used. This also prevented falls over four levels simultaneously.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data