logo

Qatar QAFCO 5·6 Project

Sector: Chemical (Industrial) • Location: Qatar

Source: Hyundai Engineering

Project
Closed

The world’s largest fortress on the deserts…stood out with its technical prowessAppearing as a secret fortress on the vast deserts, Qatar QAFCO 5·6 project is located in Mesaieed Industrial City (MIC) 48km south of Doha, the capital of Qatar. This was a representative plant construction site completed by Hyundai E&C in September 2012.The world’s single largest regional urea fertilizer plant projec

Project Information FAQ

Project Information

5 Q
The project “Qatar QAFCO 5·6 Project” is an infrastructure initiative in the Chemical (Industrial) sector, located in Qatar. Taiyo aggregates data on it from Hyundai Engineering.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The world’s largest fortress on the deserts…stood out with its technical prowessAppearing as a secret fortress on the vast deserts, Qatar QAFCO 5·6 project is located in Mesaieed Industrial City (MIC) 48km south of Doha, the capital of Qatar. This was a representative plant construction site completed by Hyundai E&C in September 2012.The world’s single largest regional urea fertilizer plant projectHyundai E&C won the USD 2.9-billion Qafco-5 contract ordered by QAFCO(Qatar Fertilizer Co,.) in December 2007 by forming a consortium with Saipem S.p.A. In October 2009, and additionally won the USD 600-million Qafco-6 contract. Based on the reliability of the ordering organization, the contract was amounted to a total of USD 3.5 billion (USD 1.2 billion for Hyundai E&C).    The project known for the world’s single largest production capacity was installing various utilities, control building, generator, substation, liquified ammonia storage tank, urea product storage facility and transportation structure, and loading docks to two 2,300-ton ammonia plants and 3850-ton urea plants.Headed for successful completion by overcoming hardshipsIt was much more difficult for us to design and construct a fertilizer plant compared to other chemical plants. Many numbers of chemical devices were used to create fertilizer, and chemical reaction was required by using gas as raw material. Moreover, in the early stage of site opening, we encountered with unexpected challenges including work interruption due to picky safety and environmental regulation of the ordering organization·relevant organization and the re-construction due to frequently changed design. However, Hyundai E&C tackled all issues based on the accumulated manpower, experience, and unique challenging spirit as the first generation of the Korean company entering the overseas construction market.We were committed to ensuring safety in process management by injecting the maximum of 15,000 workforce and 470 medium·large equipment while installing about 50,000 tons of machine and 1.73 million dia-inch piping, and 40,00 tons of steel frame. We also actively utilized the knowhow accumulated in other fertilizer plant projects in Iraq, Malaysia, and Thailand.Furthermore, we introduced “Heat Stress Flag System” to improve work efficiency and manage the health of worker. We informed the current temperature, break hour, and the amount of water to intake with different flag colors and placed the Heat Stress Flag System Table translated in each foreign language in several places of the site.Such efforts made by the field employees contributed to the successful completion of Qafco-5 and Qafco-6 in June 2011 and September 2012, respectively. Currently, the Qatar QAFCO 5·6 site is positioned as the world’s single largest regional urea fertilizer plant and a representative project making the name of Hyundai E&C known globally.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data