QatarEnergy North Field West LNG Project Equipment Supply
One of 931 projects Taiyo tracks in Qatar.
Source: Stock Titan
Supply of six Frame 9 gas turbines, 12 centrifugal compressors, and integrated power solutions with three Frame 6 gas turbines and three BRUSH Power Generation generators for two LNG mega trains at the North Field West project.
- Status
- Closed
- Sector
- Power Generation (CCGT), LNG
- Location
- Qatar
- Updated
- 22 Jul 2026
- Source
- Stock Titan
ConstructChat
Ask ConstructChat about QatarEnergy North Field West LNG Project Equipment Supply
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Supply of six Frame 9 gas turbines, 12 centrifugal compressors, and integrated power solutions with three Frame 6 gas turbines and three BRUSH Power Generation generators for two LNG mega trains at the North Field West project. |
Original sector | Energy |
Location
Country | Qatar |
Source
Source | Stock Titan |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), LNG |
Article published date | 2026-04-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
