Qatari LNG Supply to Edison
Sector: Natural Gas • Location: Qatar
Source: BOE Report
This project involves the supply of liquefied natural gas (LNG) from QatarEnergy to Edison, a European customer. The supply was disrupted due to Iranian attacks damaging Qatar's LNG export capacity. After a peace deal between the United States and Iran, QatarEnergy expects to resume supplying about two-thirds of the contracted LNG volumes to Edison within 30-45 days. Edison has a long-term contrac
- Status
- Prospective
- Sector
- Natural Gas, LNG
- Location
- Qatar
- Updated
- 22 Jul 2026
- Source
- BOE Report
ConstructChat
Ask ConstructChat about Qatari LNG Supply to Edison
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned to resume |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves the supply of liquefied natural gas (LNG) from QatarEnergy to Edison, a European customer. The supply was disrupted due to Iranian attacks damaging Qatar's LNG export capacity. After a peace deal between the United States and Iran, QatarEnergy expects to resume supplying about two-thirds of the contracted LNG volumes to Edison within 30-45 days. Edison has a long-term contract for 6.4 billion cubic metres of gas per year, which accounts for 10% of Italy's annual gas consumption. |
Original sector | Energy |
Location
Country | Qatar |
Source
Source | BOE Report |
URL |
More Details
Record type | Project |
Sector | Natural Gas, LNG |
Article published date | 2026-05-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
