QEW Credit River Bridge
Sector: Automotive • Location: Mississauga, Ontario, Canada
Source: P3Spectrum, Canada
QEW Credit River (The Project) Overview The QEW Credit River Bridge was constructed in 1934 and consisted of two lanes in each direction. It was widened in 1959 to its current configuration which provides a total of 6 lanes. Due to the significance of the QEW corridor, the portion of the highway carries in excess of 200,000 vehicles per day and is a critical component of the provincial highway net
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | shortlist |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | QEW Credit River (The Project) Overview The QEW Credit River Bridge was constructed in 1934 and consisted of two lanes in each direction. It was widened in 1959 to its current configuration which provides a total of 6 lanes. Due to the significance of the QEW corridor, the portion of the highway carries in excess of 200,000 vehicles per day and is a critical component of the provincial highway network supporting commuter and trade traffic. The 250 meter bridge is over 75 years old and recent investigations suggest that the bridge conditions have deteriorated. The bridge is in need of major or repair or replacement. The bridge was last rehabilitated in 1987 and the existing bridge deck from the 1930’s is in very poor condition. Traffic must be removed from the existing structure by the end of 2022. The Project Goals: Address the structural needs of the Credit River Bridge Ensure the roadway elements (lane width, shoulders, barriers, etc.) meet the current standards Meet the infrastructure needs to address future improvements to support the Growth Plan for the Greater Golden Horseshoe for the QEW and the Mississauga Road Interchange |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
