QGOG Rigs
Sector: Water Supply and Storage • Location: Brazil
Source: International Finance Corporation (IFC)
QGOG has been awarded separate contracts to build and operate two dynamically positioned semi-submersible offshore drilling rigs capable of working in water depths of up to 2,000 m and 2,400 m respectively.QGOG, the oil and gas subsidiary of Queiroz Galvão S.A. (QG), will operate these rigs for Petrobras in Brazil. The rigs will have the latest, well established designs and equipment and are to be
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | QGOG has been awarded separate contracts to build and operate two dynamically positioned semi-submersible offshore drilling rigs capable of working in water depths of up to 2,000 m and 2,400 m respectively.QGOG, the oil and gas subsidiary of Queiroz Galvão S.A. (QG), will operate these rigs for Petrobras in Brazil. The rigs will have the latest, well established designs and equipment and are to be built separately under:- EPC contract with Single Buoy Moorings Inc., a subsidiary of SBM Offshore N.V. at the Gulf Piping shipyard in Abu Dhabi (owned by International Management and Construction Company which is well known in the region), and - another shipbuilding contract with Keppel at its shipyard in Singapore. The rig designs are well established and many similar rigs are in use worldwide. The rigs are expected to be built, mobilized and placed under contracts to Petrobras. QGOG already operates two shallow water semi-submersible rigs acquired in the mid-1990s for Petrobras. It will use its existing onshore base in Macae to support rig operations. IFC has been invited to join a group of lenders to finance this project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- AEGEA Aguas do Rio - Bloco 4
- Pocos de Caldas Transmissora de Energia Ltda
- Serra da Mesa Transmissora de Energia S.A.
