Qiman 1000MW wind storage project
Sector: Wind • Location: China
Source: World Bank Group
The project comprises the development of a 1000-MW wind power and supporting energy storage project in Qiman Wind Area, Bazhou, Bayinguoleng Mongolian Autonomous Prefecture, Xinjiang, China, referred to as Qiman 1000MW wind storage project. The sponsor is TBEA holding company Ruoqiang County Tongchang New Energy Co., Ltd., which invested in the construction $48.9m (355,723.94 million yuan). It was
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project comprises the development of a 1000-MW wind power and supporting energy storage project in Qiman Wind Area, Bazhou, Bayinguoleng Mongolian Autonomous Prefecture, Xinjiang, China, referred to as Qiman 1000MW wind storage project. The sponsor is TBEA holding company Ruoqiang County Tongchang New Energy Co., Ltd., which invested in the construction $48.9m (355,723.94 million yuan). It was announced around July 1st, 2024. It will be built in two phases, with the first phase building a 200MW wind power and supporting energy storage project and the second phase building an 800MW wind power and supporting energy storage project. The first phase has a construction period of 13 months, and the second phase - 21 months. The construction content mainly includes 1000MW wind turbines and supporting facilities, a 220kV booster station, a 110kV booster station, a 200MW/800MWh energy storage system. The farm wind power density level is D-2 to 3. The annual effective utilization hours of the 200MW wind power and supporting energy storage are 2527h. Considering certain power restrictions, the annual average power generation of the project is 342.2297 million Kw/h. The annual effective utilization hours of the 800MW wind power and supporting energy storage are 2344h. The annual average power generation of the project is 1250.1643 million kW/h. https://min.news/en/economy/f81948e7ef6fb61301bc0faa4fc5a538.html ; https://www.gem.wiki/Xinjiang_Ruoqiang_Qiman_(TBEA)_wind_farm ; http://www.chinep.net/newsss/show.php?itemid=8818 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
