logo

Qingshan Lake Green Lake Road Phase III

Sector: Hydro • Location: Zhejiang, China

Source: World Bank Group

Project
Active

Sub-project 1: From the Qinghai Lake Dam at the end of the second phase to the Qinshan Wharf at the end of the first phase, the main line is about 7.6 kilometers long, the Xinfu Pharmaceutical and Zhucun access lines are about 0.65 kilometers, and the hiking trail is about 3.8 kilometers. About 1 km. The supporting facilities mainly include 1 landscape bridge and 5 stations, including 1 level 1 st

Status
Prospective
Sector
Hydro, Water Supply and Storage, Bridge, Car parking, Road, Government, Automotive, Commercial, Hotel, Waste Processing and Treatment
Location
Zhejiang, China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Qingshan Lake Green Lake Road Phase III

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Qingshan Lake Green Lake Road Phase III” is an infrastructure initiative in the Hydro sector, located in Zhejiang, China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Sub-project 1: From the Qinghai Lake Dam at the end of the second phase to the Qinshan Wharf at the end of the first phase, the main line is about 7.6 kilometers long, the Xinfu Pharmaceutical and Zhucun access lines are about 0.65 kilometers, and the hiking trail is about 3.8 kilometers. About 1 km. The supporting facilities mainly include 1 landscape bridge and 5 stations, including 1 level 1 station, 2 level 2 stations, 2 level 3 stations, 6 public toilets, 148 garbage bins and 14 viewing platforms, including mountainous areas. There are 9 viewing platforms and 5 waterfront viewing platforms; 6 bicycle rental points, 6 ecological parking lots, 2 bus stops; and 1 tourist reception center. Create three, four parks and more. Subproject 2: The main line is 1.43 kilometers long, the double line length is 1.13 kilometers, and the total length is 2.56 kilometers. The main construction contents of the project are roads, bridges, water supply and drainage, street lamps, integrated pipelines, stations, viewing platforms, landscape nodes, marking systems, etc. Project 3: The total length is about 10.2 kilometers, of which the main line is about 8 kilometers long and the total length of the double line is about 2.2 kilometers. Type of concession is BOT with a contract period of 11 years. Financial close occurred on May 7, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=8c629a8dfc004056a95df5cced147c3f

Original sector

Transport

Procurement method

Budget

Location

Country

China

State

Zhejiang

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Water Supply and Storage, Bridge, Car parking, Road, Government, Automotive, Commercial, Hotel, Waste Processing and Treatment

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project