Qingshan Lake Green Lake Road Phase III
Sector: Road • Location: China
Source: World Bank Group
Sub-project 1: From the Qinghai Lake Dam at the end of the second phase to the Qinshan Wharf at the end of the first phase, the main line is about 7.6 kilometers long, the Xinfu Pharmaceutical and Zhucun access lines are about 0.65 kilometers, and the hiking trail is about 3.8 kilometers. About 1 km. The supporting facilities mainly include 1 landscape bridge and 5 stations, including 1 level 1 st
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Sub-project 1: From the Qinghai Lake Dam at the end of the second phase to the Qinshan Wharf at the end of the first phase, the main line is about 7.6 kilometers long, the Xinfu Pharmaceutical and Zhucun access lines are about 0.65 kilometers, and the hiking trail is about 3.8 kilometers. About 1 km. The supporting facilities mainly include 1 landscape bridge and 5 stations, including 1 level 1 station, 2 level 2 stations, 2 level 3 stations, 6 public toilets, 148 garbage bins and 14 viewing platforms, including mountainous areas. There are 9 viewing platforms and 5 waterfront viewing platforms; 6 bicycle rental points, 6 ecological parking lots, 2 bus stops; and 1 tourist reception center. Create three, four parks and more. Subproject 2: The main line is 1.43 kilometers long, the double line length is 1.13 kilometers, and the total length is 2.56 kilometers. The main construction contents of the project are roads, bridges, water supply and drainage, street lamps, integrated pipelines, stations, viewing platforms, landscape nodes, marking systems, etc. Project 3: The total length is about 10.2 kilometers, of which the main line is about 8 kilometers long and the total length of the double line is about 2.2 kilometers. Type of concession is BOT with a contract period of 11 years. Financial close occurred on May 7, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=8c629a8dfc004056a95df5cced147c3f |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
