Qingshan Lake Green Lake Road Phase III

Sector: Road • Location: China

Source: World Bank Group

Project
Active

Sub-project 1: From the Qinghai Lake Dam at the end of the second phase to the Qinshan Wharf at the end of the first phase, the main line is about 7.6 kilometers long, the Xinfu Pharmaceutical and Zhucun access lines are about 0.65 kilometers, and the hiking trail is about 3.8 kilometers. About 1 km. The supporting facilities mainly include 1 landscape bridge and 5 stations, including 1 level 1 st

Project Information FAQ

Project Information

4 Q
The project “Qingshan Lake Green Lake Road Phase III” is an infrastructure initiative in the Road sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Sub-project 1: From the Qinghai Lake Dam at the end of the second phase to the Qinshan Wharf at the end of the first phase, the main line is about 7.6 kilometers long, the Xinfu Pharmaceutical and Zhucun access lines are about 0.65 kilometers, and the hiking trail is about 3.8 kilometers. About 1 km. The supporting facilities mainly include 1 landscape bridge and 5 stations, including 1 level 1 station, 2 level 2 stations, 2 level 3 stations, 6 public toilets, 148 garbage bins and 14 viewing platforms, including mountainous areas. There are 9 viewing platforms and 5 waterfront viewing platforms; 6 bicycle rental points, 6 ecological parking lots, 2 bus stops; and 1 tourist reception center. Create three, four parks and more. Subproject 2: The main line is 1.43 kilometers long, the double line length is 1.13 kilometers, and the total length is 2.56 kilometers. The main construction contents of the project are roads, bridges, water supply and drainage, street lamps, integrated pipelines, stations, viewing platforms, landscape nodes, marking systems, etc. Project 3: The total length is about 10.2 kilometers, of which the main line is about 8 kilometers long and the total length of the double line is about 2.2 kilometers. Type of concession is BOT with a contract period of 11 years. Financial close occurred on May 7, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=8c629a8dfc004056a95df5cced147c3f

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data