Qingshan Lake Green Lake Road Phase III
Active · China
Source: World Bank Group
Sub-project 1: From the Qinghai Lake Dam at the end of the second phase to the Qinshan Wharf at the end of the first phase, the main line is about 7.6 kilometers long, the Xinfu Pharmaceutical and Zhucun access lines are about 0.65 kilometers, and the hiking trail is about 3.8 kilometers. About 1 km. The supporting facilities mainly include 1 landscape bridge and 5 stations, including 1 level 1 st
- Status
- Prospective
- Sector
- Hydro, Water Supply and Storage, Bridge, Car parking, Road, Government, Automotive, Commercial, Hotel, Waste Processing and Treatment
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Qingshan Lake Green Lake Road Phase III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sub-project 1: From the Qinghai Lake Dam at the end of the second phase to the Qinshan Wharf at the end of the first phase, the main line is about 7.6 kilometers long, the Xinfu Pharmaceutical and Zhucun access lines are about 0.65 kilometers, and the hiking trail is about 3.8 kilometers. About 1 km. The supporting facilities mainly include 1 landscape bridge and 5 stations, including 1 level 1 station, 2 level 2 stations, 2 level 3 stations, 6 public toilets, 148 garbage bins and 14 viewing platforms, including mountainous areas. There are 9 viewing platforms and 5 waterfront viewing platforms; 6 bicycle rental points, 6 ecological parking lots, 2 bus stops; and 1 tourist reception center. Create three, four parks and more. Subproject 2: The main line is 1.43 kilometers long, the double line length is 1.13 kilometers, and the total length is 2.56 kilometers. The main construction contents of the project are roads, bridges, water supply and drainage, street lamps, integrated pipelines, stations, viewing platforms, landscape nodes, marking systems, etc. Project 3: The total length is about 10.2 kilometers, of which the main line is about 8 kilometers long and the total length of the double line is about 2.2 kilometers. Type of concession is BOT with a contract period of 11 years. Financial close occurred on May 7, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=8c629a8dfc004056a95df5cced147c3f |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Bridge, Car parking, Road, Government, Automotive, Commercial, Hotel, Waste Processing and Treatment |
Article published date | 2024-05-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
