logo

Qingshanhu Wastewater Treatment Plant

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

On January 16th, 2003, Berlinwasser International (BWI) signed a 20-year BOT contract for the construction and operation of the Qingshanhu Wastewater Treatment Plant with the Municipal Public Utility Bureau (MPUB) and the Wastewater Disposal Company (NSDPL) of the city of Nanchang, the capital of Jiangxi province in south-eastern China. The plant was to have a capacity of 330,000 cubic meters per

Project Information FAQ

Project Information

4 Q
The project “Qingshanhu Wastewater Treatment Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

On January 16th, 2003, Berlinwasser International (BWI) signed a 20-year BOT contract for the construction and operation of the Qingshanhu Wastewater Treatment Plant with the Municipal Public Utility Bureau (MPUB) and the Wastewater Disposal Company (NSDPL) of the city of Nanchang, the capital of Jiangxi province in south-eastern China. The plant was to have a capacity of 330,000 cubic meters per day and was to purify the wastewater produced by over 1 million people in this city with a total population of around 3.5 million. To implement the contract, Nanchang Qingshanhu Project Co. Ltd was created as the project company which was owned by BWI (80%) and the state-owned Shanghai Environmental Protection Group (20%). BWI, in turn, was a wholly owned subsidiary of Berlinwasser Holdings. The project was to have a construction period of 18 months, followed by an operating period of 20 years with BWI taking over responsibility for the operation of the plant and the purification of the wastewater in accordance with environmental protection standards. Third Construction & Engineering Co. Ltd. of the Beijing Urban Construction Group was contracted as general contractor for the project. Total investment of BWI for the plant was RMB 232 million (US$ 28.02 million). The project finance agreement for CNY 200 million (approx. Euro 22.5 million) was concluded with the ICBC (Industrial and Commercial Bank of China). The construction works began in early 2003 and completion and commissioning of the plant was expected in October 2004. In January of 2006, Marubeni Corp. of Japan purchased an 80% stake in BWI from Berlinwasser Holdings for US$52 million. Updates of the investment of BWI was based on a survey. None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data