QTS Data Center Construction
One of 10,000+ projects Taiyo tracks in Iowa.
Source: KCRG
QTS is building a data center near the Eastern Iowa Airport in southwest Cedar Rapids. The project includes a closed-loop cooling system to reduce water consumption and is committed to paying 100% of its energy needs. The construction site was toured by U.S. Energy Secretary Chris Wright, who addressed concerns about utility rates and water usage.
- Status
- Under Construction
- Sector
- Airport, Power Transmission, Data Center, Water Supply and Storage, Power Generation (CCGT), Commercial
- Location
- Cedar Rapids, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- KCRG
ConstructChat
Ask ConstructChat about QTS Data Center Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | QTS is building a data center near the Eastern Iowa Airport in southwest Cedar Rapids. The project includes a closed-loop cooling system to reduce water consumption and is committed to paying 100% of its energy needs. The construction site was toured by U.S. Energy Secretary Chris Wright, who addressed concerns about utility rates and water usage. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Iowa |
City | Cedar Rapids |
Source
Source | KCRG |
URL |
More Details
Record type | Project |
Sector | Airport, Power Transmission, Data Center, Water Supply and Storage, Power Generation (CCGT), Commercial |
Article published date | 2026-04-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
