quA-ymn solar project
Completed · British Columbia · Last reported Jun 2025
Source: Summerland Review
The quA-ymn solar project is a 15 megawatt commercial solar facility located on 24 hectares of reclaimed land at Teck Highland Valley Copper Operations, between Ashcroft and Logan Lake. It is the largest commercial solar installation in British Columbia, with 39,000 solar panels producing enough energy to power more than 2,400 homes annually for up to 40 years. The project was developed by the shQ
- Status
- Closed
- Sector
- Solar, Metal, Raw Materials, Power Generation (CCGT), Commercial
- Location
- Logan Lake, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Summerland Review
ConstructChat
Ask ConstructChat about quA-ymn solar project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The quA-ymn solar project is a 15 megawatt commercial solar facility located on 24 hectares of reclaimed land at Teck Highland Valley Copper Operations, between Ashcroft and Logan Lake. It is the largest commercial solar installation in British Columbia, with 39,000 solar panels producing enough energy to power more than 2,400 homes annually for up to 40 years. The project was developed by the shQUAQUAsh Energy Limited Partnership, a partnership between the Nlaka’pamux Nation Tribal Council and BluEarth Renewables. |
Original sector | Energy |
Location
Country | Canada |
State | British Columbia |
City | Logan Lake |
Source
Source | Summerland Review |
URL |
More Details
Record type | Project |
Sector | Solar, Metal, Raw Materials, Power Generation (CCGT), Commercial |
Article published date | 2025-11-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in Canada
- Calgary Board of Education K-4 School Bundle
- Acden Corporate Headquarters and Fleet Facility
- Bluenose Academy
- Brandon - Transit Shelters Lighting Project
- Grand Renewable Energy Park Haldimand County Ontario
- Sheridan College Hazel McCallion Campus (Phase 2)
- Solar System for Community Cultural Complex and Roundhouse
- Sol Aurora Solar Project
