Quail - Meachum - Watkins 69kV Project
Sector: Steel • Location: Arizona, United States of America
Source: Dodge
The selected route will tap into the existing line at Bella Vista and Schnepf roads, with the new line running along the north side of UnionPacific Railroad and connecting to the future Watkins substation. Typically, new 69-kV lines are built on a mix of steel and wood poles about 65 feet tall. However, this particular 69kV line will be underbuilt on the future Abel-Moody 230kV poles
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | delayed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The selected route will tap into the existing line at Bella Vista and Schnepf roads, with the new line running along the north side of UnionPacific Railroad and connecting to the future Watkins substation. Typically, new 69-kV lines are built on a mix of steel and wood poles about 65 feet tall. However, this particular 69kV line will be underbuilt on the future Abel-Moody 230kV poles |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
