Quail Forest Sec 1 & 2 Water Main Replacement
Sector: Water Supply and Storage • Location: Houston, Texas, United States of America
Source: Dodge
Scope of Work of the Contract Documents includes the following: 1. Install 6-inch and 8-inch DR18 Fusible PVC Water Mains by pipe burst method. 2. Install 10-inch DR18 Fusible PVC Water Main by slip lining existing 12- inch. 3. Replace all existing gate valves, cast iron fittings, fire hydrants, etc. 4. Construct temporary bypass service lines as needed. 5. Repair existing site affected. 6. Furnis
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Raw Materials, Metal, Government, Steel
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Quail Forest Sec 1 & 2 Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of Work of the Contract Documents includes the following: 1. Install 6-inch and 8-inch DR18 Fusible PVC Water Mains by pipe burst method. 2. Install 10-inch DR18 Fusible PVC Water Main by slip lining existing 12- inch. 3. Replace all existing gate valves, cast iron fittings, fire hydrants, etc. 4. Construct temporary bypass service lines as needed. 5. Repair existing site affected. 6. Furnish and install all subsidiary items as necessary to complete the project. 7. Perform testing as sp... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Raw Materials, Metal, Government, Steel |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
