logo

Qualicum Beach - Beach Creek Culvert Replacement at Crescent Road East

Sector: Water Supply and Storage • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Completed

The project is to replace two failing corrugated steel culverts under a deep road embankment crossing a fish bearing creek. The road fill and culverts provide temporary storage and attenuation of the flows in Beach Creek during major precipitation events, that are anticipated to increase in severity with climate change. The existing culverts do not have the hydraulic capacity for more extreme futu

Status
Closed
Sector
Water Supply and Storage, Cement, Steel, Residential, Commercial, Road
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Qualicum Beach - Beach Creek Culvert Replacement at Crescent Road East

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Qualicum Beach - Beach Creek Culvert Replacement at Crescent Road East” is an infrastructure initiative in the Water Supply and Storage sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is to replace two failing corrugated steel culverts under a deep road embankment crossing a fish bearing creek. The road fill and culverts provide temporary storage and attenuation of the flows in Beach Creek during major precipitation events, that are anticipated to increase in severity with climate change. The existing culverts do not have the hydraulic capacity for more extreme future events and the failure, blockage or exceedance of capacity would result in the creation of a reservoir behind the embankment beyond the capability of the embankment to resist without failure. The embankment was constructed more than 70 years ago principally of sand and has been judged by current geotechnical assessment to have poor seismic resistance especially in a saturated state. The failure of the embankment under such conditions would inundate a downstream area comprised of residential and commercial buildings as well as a major intersection of two numbered highways. The project components are: - approx. 37.5 m of fish passable concrete box culvert - approx. 180 m2 of mechanically stabilized earth wall - approx. 8,000 m3 of structural embankment - a fish passable flow control structure - inlet and outlet headwalls - rip-rap armoring - fish spawning gravel placement - approx. 113 m of watermain replacement, and - approx. 610 m2 of road reconstruction including roadside handrails, barrier curbs, painted lines, and bicycle lane flexible delineators.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Steel, Residential, Commercial, Road

Article published date

2026-04-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project