logo
ProjectActive

Quang Ninh LNG plant

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Quang Ninh LNG gas power plant project is invested in Cam Thinh ward, Cam Pha city, with a total estimated investment of 47,480 billion VND ($ 2 billion), invested by PV Power-Colavi-Tokyo Gas-Marubeni joint venture. This is the first power plant project using imported LNG in the North. Construction investment scale includes: 1 LNG gas power plant with capacity of 1,500 MW; 1 LNG import terminal f

Status
Prospective
Sector
Solar, LNG, Natural Gas, Power Generation (CCGT), Seaport, Government, Manufacturing (Industrial)
Location
Vietnam
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Quang Ninh LNG plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Quang Ninh LNG plant” is an infrastructure initiative in the Solar sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Quang Ninh LNG gas power plant project is invested in Cam Thinh ward, Cam Pha city, with a total estimated investment of 47,480 billion VND ($ 2 billion), invested by PV Power-Colavi-Tokyo Gas-Marubeni joint venture. This is the first power plant project using imported LNG in the North. Construction investment scale includes: 1 LNG gas power plant with capacity of 1,500 MW; 1 LNG import terminal for ships of 71,500 DWT; 2 LNG storage tanks with capacity of 100,000 m3/tank with regasification system; the connection between the dock and the LNG storage facility is a liquid LNG pipeline with a length of about 3-3.5km; connect the plant to the national grid system by a newly built 500 kV transmission line about 30 km long from the factory to the Quang Ninh 500 kV station in Thong Nhat commune, Ha Long city. Construction started on October 24, 2021. https://www.vietnamplus.vn/quang-ninh-khoi-cong-4-du-an-voi-tong-von-dau-tu-gan-285-nghin-ty-dong/748661.vnp

Original sector

Energy

Budget

Location

Country

Vietnam

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, LNG, Natural Gas, Power Generation (CCGT), Seaport, Government, Manufacturing (Industrial)

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project