Quang Tri Thermal Power Plant
Sector: Geothermal • Location: Quang Tri, Vietnam
Source: The Investor
The Quang Tri Thermal Power Plant project consists of two 660 MW units with a total capacity of 1,320 MW and an investment of over $2.08 billion. Originally approved under the BOT model by EGATi, the project faced delays and EGATi withdrew in 2024. EVNGENCO1 has requested to be assigned as the new investor, targeting groundbreaking in Q3 2027 and commercial operation in Q4 2030.
- Status
- Failure
- Sector
- Geothermal, LNG, Power Generation (CCGT), Commercial
- Location
- Quang Tri, Vietnam
- Updated
- 22 Jul 2026
- Source
- The Investor
ConstructChat
Ask ConstructChat about Quang Tri Thermal Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Quang Tri Thermal Power Plant project consists of two 660 MW units with a total capacity of 1,320 MW and an investment of over $2.08 billion. Originally approved under the BOT model by EGATi, the project faced delays and EGATi withdrew in 2024. EVNGENCO1 has requested to be assigned as the new investor, targeting groundbreaking in Q3 2027 and commercial operation in Q4 2030. |
Original sector | Energy |
Budget |
Location
Country | Vietnam |
State | Quang Tri |
Source
Source | The Investor |
URL |
More Details
Record type | Project |
Sector | Geothermal, LNG, Power Generation (CCGT), Commercial |
Article published date | 2025-09-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
