Quantification of Cost, Benefits, and Risk Associated With Different Quality and Project Delivery Systems

Sector: Commercial • Location: Washington, United States of America (USA)

Source: Federal Highway Administration (FHWA)

Project
Completed

This study investigates and compares the costs, benefits, and risks associated with the design-bid-build, design-build, and construction manager/general contractor project delivery systems, as well as those related to use of early completion incentives/disincentives (I/D). The scope of the study covers various types, sizes, and scopes of transportation projects delivered by State highway agencies.

Project Information FAQ

Project Information

5 Q
The project “Quantification of Cost, Benefits, and Risk Associated With Different Quality and Project Delivery Systems” is an infrastructure initiative in the Commercial sector, located in Washington, United States of America (USA). Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This study investigates and compares the costs, benefits, and risks associated with the design-bid-build, design-build, and construction manager/general contractor project delivery systems, as well as those related to use of early completion incentives/disincentives (I/D). The scope of the study covers various types, sizes, and scopes of transportation projects delivered by State highway agencies. The study involves collecting, organizing, and analyzing data from various highway agencies. The research product is guidance for State highway agencies to assist them in determining when to use each of the various project delivery systems to realize maximum benefit with regard to cost, benefits, and risk, as well as to determine appropriate incentive/disincentive levels for completion time.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data