Quartz Hill - Elizabeth Lake Rd at Mesquite Rd
Completed · California
Source: LA County Department of Public Work (DPW)
The objective of this project is to upgrade signal mast arm and install additional vehicle heads for through movements from the East bound and West bound travel, install a West approach through nearside high mount vehicle head on the Southeast corner standard, install detectable warning surfaces on the Northwest curb access ramp, install bicycle loops, and install continental crosswalk.
- Status
- Closed
- Sector
- Road, Government, Residential
- Location
- California, United States of America
- Updated
- 22 Jul 2026
- Source
- LA County Department of Public Work (DPW)
ConstructChat
Ask ConstructChat about Quartz Hill - Elizabeth Lake Rd at Mesquite Rd
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of this project is to upgrade signal mast arm and install additional vehicle heads for through movements from the East bound and West bound travel, install a West approach through nearside high mount vehicle head on the Southeast corner standard, install detectable warning surfaces on the Northwest curb access ramp, install bicycle loops, and install continental crosswalk. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | California |
Source
Source | LA County Department of Public Work (DPW) |
URL |
More Details
Record type | Project |
Sector | Road, Government, Residential |
Article published date | 2024-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
