logo
ProjectClosed

Quast Bridge 8169 South Abutment Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Rehabilitation of the south abutment of bridge #8169, including installation of new piles founded on bedrock, demolition of existing cast-in-place south abutment, and installation of new lock block abutment wall and wing walls.

Status
Closed
Sector
Bridge, Road, Commercial
Location
Seymour Arm, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Quast Bridge 8169 South Abutment Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Quast Bridge 8169 South Abutment Replacement” is an infrastructure initiative in the Bridge sector, located in Seymour Arm, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Rehabilitation of the south abutment of bridge #8169, including installation of new piles founded on bedrock, demolition of existing cast-in-place south abutment, and installation of new lock block abutment wall and wing walls.

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Seymour Arm

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Commercial

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project