logo

Quechan Discharge Piping System Project - Drainage Well #4 (DW-4)

Sector: Commercial • Location: United States of America

Source: Grants.gov

Project
Archived

The proposed agreement will support the Quechan Indian Tribe’s efforts to abandon a 1200-foot discharge pipeline and to complete the installation of a replacement pipeline. The existing discharge piping system is buried under a dirt parking lot, at unknown depth and location, and has surpassed its useful life. The new discharge piping system will be placed adjacent to the existing line and will

Project Information FAQ

Project Information

5 Q
The project “Quechan Discharge Piping System Project - Drainage Well 4 (DW-4)” is an infrastructure initiative in the Commercial sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed agreement will support the Quechan Indian Tribe’s efforts to abandon a 1200-foot discharge pipeline and to complete the installation of a replacement pipeline. The existing discharge piping system is buried under a dirt parking lot, at unknown depth and location, and has surpassed its useful life. The new discharge piping system will be placed adjacent to the existing line and will be constructed with heavier gauge large-diameter piping. Abandonment and replacement of the drainage well will prevent failure, reduce seepage, resolve flooding concerns and diminish the risk of non-point source pollution caused through unintentional breakage of the existing, dilapidated discharge piping system. Recipient Responsibilities The Recipient shall carry out the Scope of Work in accordance with the terms and conditions of the proposed financial assistance agreement. The Recipient shall adhere to Federal, state, and local laws, regulations, and codes, as applicable, and shall coordinate with Reclamation on all required approvals and permits. The following are specific Recipient Responsibilities to this award: - The Recipient will manage activities associated with the installation of the new discharge piping system improvements at the site. - Prior to the work commencing, the Tribe will coordinate with Reclamation on the development of approved designs and engineering specifications. Reclamation Responsibilities Reclamation will monitor and provide federal oversight of activities performed under this Agreement. Monitoring and oversight includes review and approval of financial status and performance reports, payment requests, and any other deliverables identified as part of the Scope of Work. Additional monitoring activities may include site visits, conference calls, and other on-site and off-site monitoring activities. At the Recipient’s request, Reclamation may also provide technical assistance to the Recipient in support of the Scope of Work and objectives of this Agreement. Substantial involvement by Reclamation is anticipated during the performance of activities funded under this cooperative agreement. In support of this Agreement, Reclamation will be responsible for the following: - Reclamation will provide the Tribe with counsel and technical assistance in securing permits for conducting the work. - Prior to the work commencing, Reclamation will review approved designs and engineering specifications. - Reclamation will support final well abandonment efforts. - Upon completion of the work and final acceptance by the Tribe, Reclamation will complete such documents required by the Bureau of Indian Affairs to cancel, modify, and/or terminate all licenses, permits, and rights-of-way associated with the DW-4 site and the location of the portion of the existing discharge line that will be abandoned.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data