Active

On May 19, 2007, the government of the Hashemite Kingdom of Jordan awarded a 25-year concession contract to ADP Consortium to operate, expand and rehabilitate the Queen Alia International Airport in Amman.

The ADP Consortium was composed of Edgo Ventures (Edgo) (9.5%), Aeroports de Paris Management (ADPM) (9.5%), Joannou & Paraskevaides (Overseas) Ltd.(9.5%), J&P-Avax (9.5%), Abu Dhabi Investm

Status
Prospective
Sector
Aerospace & Defense, Airport, Commercial, Government
Location
Jordan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Queen Alia International Airport

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Queen Alia International Airport” is an infrastructure initiative in the Aerospace & Defense sector, located in Jordan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

On May 19, 2007, the government of the Hashemite Kingdom of Jordan awarded a 25-year concession contract to ADP Consortium to operate, expand and rehabilitate the Queen Alia International Airport in Amman. The ADP Consortium was composed of Edgo Ventures (Edgo) (9.5%), Aeroports de Paris Management (ADPM) (9.5%), Joannou & Paraskevaides (Overseas) Ltd.(9.5%), J&P-Avax (9.5%), Abu Dhabi Investment Company (ADIC) (38%) and Noor Financial Investment Company (24%). The contract was awarded by following a competitive bidding process initiated in June 2006. At that time, more than 30 international companies expressed their interest in the project. The ADP Consortium won out over four other final qualified bidders by submitting the highest percentage of revenue tranfer to the government of Jordan. Under the concession agreement, the government is expected to receive 54.5% of total revenues in the first six years, then 54.6% thereafter. On November 15, 2007, the contract was officially signed and the construction and operation of Queen Alia International Airport was handed over to Airport International Group Private Shareholding Company (AIG PSC), the project comapny created by ADP Consortium. Under the term of the contract, AIG PSC was in charge of the operation and the construction of a new terminal of more than 85.000 m2. More particularly, Aeroports de Paris Management had the obligation to remain in charge of operating the airport and Joannou & Paraskevaides was in charge of building the new terminal. With this expansion, airport's total capacity was expected to increase from 3.5 to 9 million passengers per year. The project cost was evaluated at US$675 million. AIG PSC secured a US$370 million loan from the International Finance Corporation, the Islamic Development Bank, the banks Calyon, Natixis and Europe Arab Bank. Detailed financing arrangements were as follow: - An IFC US$70 million, 17-year senior loan. - An IFC US$40 million, 18-year subordinated loan with a 15-year grace period to match the cashflows generated during the concession. - An IFC US$10 million standby loan to be disbursed in the event that the cashflows generated by existing operations were insufficient to complete the financing of the new terminal during the construction phase. - The IFC mobilized US$160 million in a 16-year syndication that attracted French banks Calyon and Natixis as well as Europe Arab Bank. - The Islamic Development Bank provided a US$100 million loan. - The IFC also provided a swap to Airport International Group to minimize the interest rate risk on the transaction. The rest, about US$305 million, was agreed to be financed by equity and revenue of airport operation. In March 2013, the airport became operational.

Original sector

Transport

Procurement method

Budget

Location

Country

Jordan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Aerospace & Defense, Airport, Commercial, Government

Article published date

2024-09-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project