Queiroz Galvao HPPs
Sector: Hydro • Location: Brazil
Source: World Bank Group
The Brazilian company Construtora Queiroz Galvao S.A. was granted authorizations to build four small hydro power plants located in the state of Minas Gerais (60.5 MW in total capacity). The construction company created two special purpose company to oversee the projects: Mucuri Energia S.A. (PCH Mucuri; 22,5 MW in capacity); and RBF Geração de Energia S.A. (PCHs Cachoeira da Fumaca, Boa Vista and
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Government, Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Queiroz Galvao HPPs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Brazilian company Construtora Queiroz Galvao S.A. was granted authorizations to build four small hydro power plants located in the state of Minas Gerais (60.5 MW in total capacity). The construction company created two special purpose company to oversee the projects: Mucuri Energia S.A. (PCH Mucuri; 22,5 MW in capacity); and RBF Geração de Energia S.A. (PCHs Cachoeira da Fumaca, Boa Vista and Retiro I; 9 MW, 9 MW and 19 MW in capacity, respectively). The 30-year contract for PCH Mucuri was signed with the regulatory agency ANEEL December 2002, while similar 30 year contracts were signed for PCHs Cachoeira da Fumaca, Boa Vista and Retiro I in March 2011. The total investment in the power plants was estimated at US$ 262.3 million (BRL 428 million). In January 2011, Mucuri Energia signed a construction risk guarantee with Banco Fator amounting to US$ 81,8 million (BRL 144 million). As of August 2011, financial closure had not been achieved for the other projects. In August 2010, the sponsor began the construction of PCH Mucuri. The electricity produced in the power plant was set to be sold to the electricity distribution company CEMIG. Commercial operations of PCH Mucuri commenced in May 2013. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Foz do Chapeco Hydroelectric Power Plant
- Atiaia Energia S.A.
