Queretaro-Irapuato Highway

Sector: Automotive • Location: Querétaro, Mexico

Source: World Bank Group

Project
Active

In June 2006, the Mexican Secretary of Communications and Transport (SCT) signed a 20-year contract of the Queretaro-Irapuato highway to Ingenieros Civiles Asociados SA de CV (ICA). The Queretaro-Irapuato project was a 108 km highway in the states of Guanajuato and Queretaro. The initiative was part of the new Public-Private Partnership (PPP) program began in 2005 to improve the quality of public

Status
Prospective
Sector
Automotive, Commercial, Mass Transit, Bridge, Rail, Road, Government
Location
Querétaro, Mexico
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Queretaro-Irapuato Highway

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Queretaro-Irapuato Highway” is an infrastructure initiative in the Automotive sector, located in Querétaro, Mexico. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In June 2006, the Mexican Secretary of Communications and Transport (SCT) signed a 20-year contract of the Queretaro-Irapuato highway to Ingenieros Civiles Asociados SA de CV (ICA). The Queretaro-Irapuato project was a 108 km highway in the states of Guanajuato and Queretaro. The initiative was part of the new Public-Private Partnership (PPP) program began in 2005 to improve the quality of public services through long-term partnerships between the government and private sector companies. The Irapuato-Piedad highway, also run by ICA, was the first such venture. Responsibilities of ICA included: increasing 45.1 km of highway from two to four lanes; reconstructing 47.9km of highway; and building 8 pedestrian overpasses, 15 bridges, 3 overpasses, and one railway overpass. SCT carried out the public tender for the project. To participate in the public tender, each bidder had to calculate and submit a requested payment as a function of construction, maintenance and operating costs, rate of return on equity, estimated annual traffic and duration of contract. The concession was awarded to the bidder who presented a proposal that complied with the technical, legal and financial requirements established in the bidding documents, and requested the lowest net present value of periodic payments. Four consortia presented offers: ICA-Controladora; FCC Acciona; IDEAL; and Construobras, a consortium of four Tamaualipas state firms. SCT required bidders to confirm credit lines from their banks to make a decision. ICA-Controladora presented the lowest tariff of 1 peso per kilometer compared with 3.3 pesos per kilometer presented by FCC-Acciona and IDEAL. Although the tariff was not the only factor, SCT awarded the contract to ICA in May 2006. ICA established Concesionaria de Vias Irapuato Queretaro, S.A. de C.V. as a special purpose vehicle to hold the contract. The contract established an association between the SCT and the private participant to design, finance, build, rehabilitate, maintain and operate a highway. In exchange for those services, the private participant received periodic payments from SCT. Periodic payments come from two parts: a minimum payment for the functioning of the road according to the standards set by the contract; and a “shadow toll” or payments linked to traffic levels as determined by the SCT. The Queretaro-Irapuato highway was divided into ten sections, and SCT was to pay ICA for each section built. ICA received financial backing from Banco Santander Serfin, through a 14-year credit that was to account for US $61 million. The rest of the projected US $128 million was to be financed through equity. Banco Santander Serfin also financed ICA’s other PPP, the Irapuato-Piedad highway earlier in 2006. The Queretaro-Irapuato highway reached financial closure when the contract was signed in June as it already had significant financial support. Works were to begin in July of 2006 and end in 2009.

Original sector

Transport

Procurement method

Budget

Location

Country

Mexico

State

Querétaro

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Automotive, Commercial, Mass Transit, Bridge, Rail, Road, Government

Article published date

2024-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project