Quezon City Integrated Solid Waste Management Facility PPP Project
Sector: Water Supply and Storage • Location: Philippines
Source: InfraPPPWorld
The project involves the design, financing, construction, operation, and maintenance of an Integrated Solid Waste Management Facility Project of the Quezon City Local Government in the Philippines. The facility involves a Biodegradable Source Separated Waste Treatment and Residual Combustible Waste Treatment technologies capable of processing up to 3,000 metric tons of MSW per day and generating 3
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Mass Transit, Power Transmission, Biomass, Power Generation (CCGT), Waste Processing and Treatment, Commercial
- Location
- Philippines
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Quezon City Integrated Solid Waste Management Facility PPP Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | project in planning |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the design, financing, construction, operation, and maintenance of an Integrated Solid Waste Management Facility Project of the Quezon City Local Government in the Philippines. The facility involves a Biodegradable Source Separated Waste Treatment and Residual Combustible Waste Treatment technologies capable of processing up to 3,000 metric tons of MSW per day and generating 36 MWe (Net). Other provisional infrastructure facilities are the following:Biodegradable source separated organics (SSO) treatment facility;Residual combustible waste (RCW) treatment facility;Monofill for fly ash disposal;Other ancillary facilities, including a continuous emission monitoring system, administration building, scale house, transmission lines, and utility systems and connections.The project will be developed by a Joint Venture (JV) with a Build-Own-Operate (BOO) scheme, except in case of pre-termination whereby facility is transferred to the LGU upon paying a termination payment. The concession period is 35 years starting at the start of the operation.The joint venture will own 95% of the project while the remaining 5% will be owned by the City Government. |
Original sector | Water & Waste |
Procurement method | |
Budget |
Location
Country | Philippines |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Mass Transit, Power Transmission, Biomass, Power Generation (CCGT), Waste Processing and Treatment, Commercial |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project