logo
ProjectClosed

QUICK START GAS TURB

One of 3,483 projects Taiyo tracks in Hungary.

Source: World Bank Group

The objective of the Quick Start Gas Turbine Project is to provide about 200 Megawatt (MW) of generation reserve capacity to enable Hungary to maintain a level of reliability and security of supply in line with international standards. The project consists of two complete single cycle gas turbine power plants rated at about 110 MW each, burning light distillate fuel oil. The plants will consist

Status
Closed
Sector
Road, Water Supply and Storage, Power Transmission, Oil and Gas, Wind, Power Generation (CCGT), Government
Location
Hungary
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about QUICK START GAS TURB

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “QUICK START GAS TURB” is an infrastructure initiative in the Road sector, located in Hungary. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Quick Start Gas Turbine Project is to provide about 200 Megawatt (MW) of generation reserve capacity to enable Hungary to maintain a level of reliability and security of supply in line with international standards. The project consists of two complete single cycle gas turbine power plants rated at about 110 MW each, burning light distillate fuel oil. The plants will consist of the following fully integrated components: 1) main equipment (gas turbine and generator sets and auxiliaries, air inlet, exhaust gas systems, including stacks, electrical equipment, power plant control system, high voltage switch gear and unit transformers, enclosures and light structure buildings); 2) auxiliary systems (fuel supply system, demineralized water supply, water supply for extinguishing system, fire detection and protection system, telecommunications and remote and indication systems); 3) civil works (site preparation, leveling, earthwork, foundations, roads and fences, site improvements, cable and piping channels and trenches); and 4) network and infrastructure (telecommunications link).

Original sector

Energy and Extractives

Budget

Location

Country

Hungary

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Power Transmission, Oil and Gas, Wind, Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project