QUICK START GAS TURB
One of 3,483 projects Taiyo tracks in Hungary.
Source: World Bank Group
The objective of the Quick Start Gas Turbine Project is to provide about 200 Megawatt (MW) of generation reserve capacity to enable Hungary to maintain a level of reliability and security of supply in line with international standards. The project consists of two complete single cycle gas turbine power plants rated at about 110 MW each, burning light distillate fuel oil. The plants will consist
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Transmission, Oil and Gas, Wind, Power Generation (CCGT), Government
- Location
- Hungary
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about QUICK START GAS TURB
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Quick Start Gas Turbine Project is to provide about 200 Megawatt (MW) of generation reserve capacity to enable Hungary to maintain a level of reliability and security of supply in line with international standards. The project consists of two complete single cycle gas turbine power plants rated at about 110 MW each, burning light distillate fuel oil. The plants will consist of the following fully integrated components: 1) main equipment (gas turbine and generator sets and auxiliaries, air inlet, exhaust gas systems, including stacks, electrical equipment, power plant control system, high voltage switch gear and unit transformers, enclosures and light structure buildings); 2) auxiliary systems (fuel supply system, demineralized water supply, water supply for extinguishing system, fire detection and protection system, telecommunications and remote and indication systems); 3) civil works (site preparation, leveling, earthwork, foundations, roads and fences, site improvements, cable and piping channels and trenches); and 4) network and infrastructure (telecommunications link). |
Original sector | Energy and Extractives |
Budget |
Location
Country | Hungary |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Transmission, Oil and Gas, Wind, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
