Quiet Dell Road Dglvr
Sector: Water Supply and Storage • Location: Aleppo Township, Pennsylvania, United States of America
Source: Dodge USA
remove and replace an existing culvert pipe on Quiet Dell Road with a 40-foot long 13 -7 x 8 -4 aluminum multi-plate horizontal ellipse pipe with end walls, install grade controls structures in the stream, install approximately 260 LF of aggregate under drain, construct approximately 80 LF of rip rap lined ditch, and place approximately 650 CY of fill to raise the existing road surface.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Metal, Steel, Government, Waste Processing and Treatment, Commercial
- Location
- Aleppo Township, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Quiet Dell Road Dglvr
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | remove and replace an existing culvert pipe on Quiet Dell Road with a 40-foot long 13 -7 x 8 -4 aluminum multi-plate horizontal ellipse pipe with end walls, install grade controls structures in the stream, install approximately 260 LF of aggregate under drain, construct approximately 80 LF of rip rap lined ditch, and place approximately 650 CY of fill to raise the existing road surface. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Aleppo Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Metal, Steel, Government, Waste Processing and Treatment, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
