logo
ProjectGc Bidding

Quieter Home Program Phase 13 Group 12

Gc bidding · California · Last reported Jan 2025

Source: Dodge

The project includes sound attenuation improvements for certain residences around San Diego International Airport. The project includes 24 dwelling units located on 17 non- historic residential properties. Sound attenuation improvements may include, but are not limited to, replacement of windows and exterior doors, finely detailed, field-executed finish carpentry, and improvements to add air condi

Status
Prospective
Sector
Airport, Government, Commercial, Power Generation (CCGT), Residential, Manufacturing (Industrial)
Location
San Diego, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Quieter Home Program Phase 13 Group 12

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Quieter Home Program Phase 13 Group 12” is an infrastructure initiative in the Airport sector, located in San Diego, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes sound attenuation improvements for certain residences around San Diego International Airport. The project includes 24 dwelling units located on 17 non- historic residential properties. Sound attenuation improvements may include, but are not limited to, replacement of windows and exterior doors, finely detailed, field-executed finish carpentry, and improvements to add air conditioning, ventilation and electrical work to support such systems. The work will include the demol...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

San Diego

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Airport, Government, Commercial, Power Generation (CCGT), Residential, Manufacturing (Industrial)

Article published date

2025-02-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project