logo
ProjectClosed

Quieter Home Program Phase 13 Group 6

Closed · California · Last reported Apr 2024

Source: Dodge USA

The project includes sound attenuation improvements for certain residences around San Diego International Airport. The project includes 32 dwelling units located on 20 non-historic residential properties. Sound attenuation improvements may include, but are not limited to, replacement of windows and exterior doors, finely detailed, field-executed finish carpentry, and improvements to add air condit

Status
Closed
Sector
Airport, Power Generation (CCGT), Residential, Government, Commercial, Manufacturing (Industrial)
Location
San Diego, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Quieter Home Program Phase 13 Group 6

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Quieter Home Program Phase 13 Group 6” is an infrastructure initiative in the Airport sector, located in San Diego, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes sound attenuation improvements for certain residences around San Diego International Airport. The project includes 32 dwelling units located on 20 non-historic residential properties. Sound attenuation improvements may include, but are not limited to, replacement of windows and exterior doors, finely detailed, field-executed finish carpentry, and improvements to add air conditioning, ventilation and electrical work to support such systems. The work will include the demoli...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

San Diego

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Airport, Power Generation (CCGT), Residential, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project