Quiluma Gas Field Development
The owner, status and timeline of this project. A free account opens every field.
Source: IndexBox
The Quiluma gas field offshore Angola is the country's first non-associated gas development. Operated by Azule Energy, a joint venture between bp and Eni, the project started gas production with an initial output of around 150 million standard cubic feet per day, aiming to increase to approximately 330 million standard cubic feet per day by late 2026. The processed gas is sent to the Angola LNG fa
- Status
- Under Construction
- Sector
- LNG, Oil and Gas
- Location
- Angola
- Updated
- 22 Jul 2026
- Source
- IndexBox
ConstructChat
Ask ConstructChat about Quiluma Gas Field Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | production started |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Quiluma gas field offshore Angola is the country's first non-associated gas development. Operated by Azule Energy, a joint venture between bp and Eni, the project started gas production with an initial output of around 150 million standard cubic feet per day, aiming to increase to approximately 330 million standard cubic feet per day by late 2026. The processed gas is sent to the Angola LNG facility for domestic use and export. |
Original sector | Energy |
Location
Country | Angola |
Source
Source | IndexBox |
URL |
More Details
Record type | Project |
Sector | LNG, Oil and Gas |
Article published date | 2026-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
