Quincy Transmission Expansion Plan
Sector: Hydro • Location: Quincy, Washington, United States
Source: GovTech
A project by Grant County Public Utility District to build electric transmission lines to move more power to Quincy, Washington, the state's de facto data center hub. The project includes adding six new transmission lines, with a key 31-mile line from Wanapum Dam to Quincy, to double the power capacity from 372 megawatts to 750 megawatts to support growing data center energy demands.
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Data Center, Power Transmission
- Location
- Quincy, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- GovTech
ConstructChat
Ask ConstructChat about Quincy Transmission Expansion Plan
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A project by Grant County Public Utility District to build electric transmission lines to move more power to Quincy, Washington, the state's de facto data center hub. The project includes adding six new transmission lines, with a key 31-mile line from Wanapum Dam to Quincy, to double the power capacity from 372 megawatts to 750 megawatts to support growing data center energy demands. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Quincy |
Source
Source | GovTech |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Data Center, Power Transmission |
Article published date | 2026-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
