R. L. Pratt WTP Lime Slurry System Replacement
Sector: Water Supply and Storage • Location: Palm Springs, Florida, United States of America
Source: Dodge
Generally, the work includes removal and installation of new lime slurry preparation and feed equipment; replacement and improvements of existing mechanical, structural, electrical facilities and components; install new control panels with plant SCADA network; site restoration and all other incidentals as indicated by the drawings and specifications or as required to properly complete the project
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Palm Springs, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about R. L. Pratt WTP Lime Slurry System Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Generally, the work includes removal and installation of new lime slurry preparation and feed equipment; replacement and improvements of existing mechanical, structural, electrical facilities and components; install new control panels with plant SCADA network; site restoration and all other incidentals as indicated by the drawings and specifications or as required to properly complete the project as planned. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Palm Springs |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
