Racetrac Grapevine Mills EDO
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Convert (4) Standard Parking Stalls To (4) Standard Ev Parking Stalls Install (2) Dual Port Abb a400 400kw Dc Fast Chargers Install New Ev Canopy And Connect To Existing Site Lighting Circuit Paint And Mark All Ev Charging Parking Stalls And Install Necessary Parking Signs
- Status
- Closed
- Sector
- Car parking, Electric Vehicles (EVs), Commercial, Manufacturing (Industrial), Automotive, Seaport, Power Generation (CCGT), Residential
- Location
- Grapevine, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Racetrac Grapevine Mills EDO
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Convert (4) Standard Parking Stalls To (4) Standard Ev Parking Stalls Install (2) Dual Port Abb a400 400kw Dc Fast Chargers Install New Ev Canopy And Connect To Existing Site Lighting Circuit Paint And Mark All Ev Charging Parking Stalls And Install Necessary Parking Signs |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Grapevine |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Electric Vehicles (EVs), Commercial, Manufacturing (Industrial), Automotive, Seaport, Power Generation (CCGT), Residential |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
