Radium Springs Middle Medical Office
Sector: Power Generation (CCGT) • Location: Albany, Georgia, United States of America
Source: Dodge USA
The scope of work includes all labor, material, and equipment required to provide the Radium Springs Middle Medical Office as specified in the bid documents. The work will include mechanical, electrical, plumbing, selective demolition, concrete, millwork, light gage metal framing/drywall, hollow metal door frames, doors/hardware, toilet accessories, acoustical ceiling, floor tile, and painting at
- Status
- Closed
- Sector
- Power Generation (CCGT), Residential, Commercial, Road, Cement, Metal, Government, Hospital, Hotel
- Location
- Albany, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Radium Springs Middle Medical Office
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work includes all labor, material, and equipment required to provide the Radium Springs Middle Medical Office as specified in the bid documents. The work will include mechanical, electrical, plumbing, selective demolition, concrete, millwork, light gage metal framing/drywall, hollow metal door frames, doors/hardware, toilet accessories, acoustical ceiling, floor tile, and painting at Radium Springs Middle Medical Office; 2600 Radium Springs Road, Albany Ga. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Albany |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Residential, Commercial, Road, Cement, Metal, Government, Hospital, Hotel |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
