logo

Ragged Lake Transit Centre Expansion and Fleet Electrification

Sector: Solar • Location: Nova Scotia, Canada

Source: Infrastructure Canada

Project
In Progress

The Ragged Lake Transit Centre Expansion and Fleet Electrification project will reduce green house gas (GHG) emissions through the procurement of 60 electric buses with battery packs, associated charging equipment for the electric buses (20 chargers, each with 2 dispensers, 9 chargers, each with 1 pantograph, 6 chargers, each with 3 dispensers), a deep energy retrofit of the existing transit facil

Status
Under Construction
Sector
Solar, Energy Storage
Location
Nova Scotia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Ragged Lake Transit Centre Expansion and Fleet Electrification

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Ragged Lake Transit Centre Expansion and Fleet Electrification” is an infrastructure initiative in the Solar sector, located in Nova Scotia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Ragged Lake Transit Centre Expansion and Fleet Electrification project will reduce green house gas (GHG) emissions through the procurement of 60 electric buses with battery packs, associated charging equipment for the electric buses (20 chargers, each with 2 dispensers, 9 chargers, each with 1 pantograph, 6 chargers, each with 3 dispensers), a deep energy retrofit of the existing transit facility (includes 1MW solar PV array) and expansion of the facility to achieve a net-zero standard. To accommodate the 60 new electric buses, a 4,600 m^2 expansion of the existing facility is required. It is expected that the electric buses will be made in Canada. Upgrades to the maintenance facility, including a step down transformer, an electrical distribution panel, 3 mobile chargers and 5 bus access platform systems will be constructed to allow for maintenance of the new electric buses. Additionally, the scope encompasses preliminary work towards constructing a Battery Energy Storage System (BESS) including a risk assessment to determine the appropriate size and type of BESS, as well as the design of the system and site preparations. The Ragged Lake Transit Centre Expansion and Fleet Electrification project will improve capacity of public transit infrastructure. Electrifying transit will result in less noise pollution and less tail pipe emissions. The project models GHG leadership, as the battery electric buses will be the first in Atlantic Canada. The addition of solar and storage will make the transit system more resilient.

Original sector

Public Transit

Location

Country

Canada

State

Nova Scotia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Solar, Energy Storage

Article published date

2026-04-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project