Raia Project Drilling Phase
Sector: Water Supply and Storage • Location: Brazil
Source: Market Screener
Equinor has initiated the drilling phase at the Raia project in Brazil's Campos Basin. The project involves drilling six wells approximately 200 kilometers offshore at a water depth of 2,900 meters. It targets reserves exceeding one billion barrels of oil equivalent with an expected production capacity of 16 million cubic meters of gas per day, representing about 15% of Brazil's total demand.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Oil and Gas
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- Market Screener
ConstructChat
Ask ConstructChat about Raia Project Drilling Phase
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Equinor has initiated the drilling phase at the Raia project in Brazil's Campos Basin. The project involves drilling six wells approximately 200 kilometers offshore at a water depth of 2,900 meters. It targets reserves exceeding one billion barrels of oil equivalent with an expected production capacity of 16 million cubic meters of gas per day, representing about 15% of Brazil's total demand. |
Original sector | Energy |
Location
Country | Brazil |
Source
Source | Market Screener |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Oil and Gas |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
